Canopy Installed on Highest Point of TRON Lightcycle Run at Magic Kingdom

Shannen Michaelsen

Canopy Installed on Highest Point of TRON Lightcycle Run at Magic Kingdom

Crews continue to install canopy pieces on the framework above TRON Lightcycle / Run in Magic Kingdom. This morning, we saw new pieces on the edge of the framework and at the highest point.

tron construction 0 2

We could see the edge piece from Storybook Circus. It’s cut to fit the unique curves of the framework.

tron construction 1 2

Crew members were in cherry pickers working on the vertebrae-like pieces surrounding the canopy framework.

tron construction 5 2
tron construction 15 2

In addition to the orange cones sitting on some of the vertebrae pieces, there are now green noodle pieces.

tron construction 2 2

Blue painter’s tape is also visible between the vertebrae.

tron construction 6 2
tron construction 7 2
tron construction 4 2

These cones and noodle pieces may be to protect the canopy and workers while pieces continue to be installed as the vertebrae pieces do come to a dull point.

tron construction 10 2

Paneling will eventually fill the spaces between the vertebrae.

tron construction 11 2
tron construction 17 2

We could see some paneling with grey sheeting still on it.

tron construction 16 2

We also took a look at the locker structure next to the coaster.

tron construction 8 2

This platform has temporary wood railings.

tron construction 9 2

Some of the steel is still exposed until more wall paneling is installed.

tron construction 30 1

From near the Tomorrowland Speedway, we could see the new canopy piece at the highest point of the framework.

tron construction 27 1
tron construction 29 1

This long strip runs almost the entire width of the canopy.

tron construction 31 1

This leaves three rows empty between the top strip and previously installed strips at the bottom.

tron construction 32 1

The crew members were still securing the canopy piece when we stopped by.

tron construction 35 1
tron construction 42

One crew member looked like they were having fun bouncing on the temporary blue netting, and we can’t blame them.

tron construction 46
tron construction c 3

The blue netting is for the safety of the workers and is being removed as the final canopy is installed.

tron construction c 0

The workers are also attached to ropes when working on the canopy.

tron construction c 2

They were making their way down the canopy as we rode by on the PeopleMover.

tron construction c 14
tron construction c 6

There are some smaller plastic-covered canopy pieces along the canopy.

tron construction c 4

We noticed this week that this area was being cleared of dirt for the second sidewalk that will wind under the first.

tron construction c 9

Dirt has been moved aside and flattened to make way for the work.

tron construction c 5

Construction materials sit on the ground and in crates on the already paved sidewalk. The median at the beginning of the paved section will hold a TRON Lightcycle / Run sign.

tron construction c 8

A lone standing wall was also installed earlier this week for an unknown reason, though it is possibly part of the tunnel for the Walt Disney World Railroad.

tron construction c 10
tron construction c 12

We didn’t see any crew members near the entrance today, which is unusual.

tron construction c 13

There is no current opening date for TRON Lightcycle / Run, and it may not even open this year. It was originally scheduled to open in time for the park’s 50th anniversary on October 1, 2021, but was delayed, partially due to COVID-19.

For the latest Disney Parks news and info, follow WDW News Today on TwitterFacebook, and Instagram.

Author

  • Shannen Michaelsen

    Shannen has been a Disney Parks fan and lover of dogs since childhood, despite Pluto's attempt to eat Shannen's Minnie Mouse doll the first time they met. They've made up now. You can email Shannen at shannen@mail.hkdrnt.com.

1 thought on “Canopy Installed on Highest Point of TRON Lightcycle Run at Magic Kingdom”

Comments are closed.