Construction has started on the front of the Crystal Arcade on Main Street, U.S.A. at Disneyland Park. The arcade remains open and is accessible from the Emporium.
The construction is visible as you approach the stores on Main Street, U.S.A.
As you can see, scaffolding and scrim have been added to the façade of the Crystal Arcade.
They also added some construction walls around the arcade.
One sign tells guests they can still enter the Crystal Arcade through the Emporium.
The sign on the other side of the Arcade suggests guests enter through the Fortuosity Shop.
This picture was taken from the inside of the arcade.
For more Disneyland construction news, check out the monorail refurbishment and parking lot tram stop work.
For more Disneyland Resort news and info, follow Disneyland News Today on Twitter, Facebook, and Instagram. For Disney Parks news worldwide, visit WDWNT.